SL. Project Name Implementing Agency DPR Cost / Estimated Project Cost Cost as per Work Order Extra Work Order Financial Progress ( in Lakhs) Financial Progress (%) PROJECT STATUS
1 Riverfront development works between Rambag Bridge to Krishnapura Bridge under Smart City Mission Vijay Pratap Sharma 4.00 3.57 2.99 83.75 Work Completed
2 Improvement of Roads (Raj Mohalla to Bada Ganpati) Som Projects Pvt Ltd 10.44 10.44 6.14 58.81 Work Completed
3 Supply, Installation, Implementation and Maintenance of GPS based Vehicle Tracking Solution (VTS) for Municipal Solid Waste (MSW), CCTV Cameras at Community & Public Toilets and Integration of Weighbridge at Devguradia Landfill Site Bio-enable Technologies Pvt. Ltd. Pune 1.50 1.29 0.18 1.47 100.00 Work Completed
4 Construction of Chandrabhaga Bridge Parshwa Builders 3.56 5.03 1.25 6.28 100.00 Work Completed
5 Construction of Central Median and Erection of
Electrical Pole on Biyabani Road & Subhash Marg, Indore.
HPL Electric & Power Pvt Ltd 2.50 3.29 2.38 72.34 Work Completed
6 Construction of Garbage Transfer Station at Sangam
Nagar under Smart City Mission
Vijay Pratap Sharma 1.34 1.07 0.25 1.32 100.00 Work Completed
7 Construction of Garbage Transfer Station at IT Park
Indore under Smart City Mission
SS Infraestate India
Pvt. Ltd.
1.70 1.36 1.14 83.82 Work Completed
8 Construction of Garbage Transfer Station at Star Square
MR-10 Indore under Smart City Mission
Manish Tainguriya 1.45 1.12 0.26 1.38 100.00 Work Completed
9 Construction of Garbage Transfer Station at Lalbag
Indore under Smart City Mission
SS Infraestate India
Pvt. Ltd.
1.23 0.99 0.30 1.29 100.00 Work Completed
10 Improvement of Roads (Vyas Bridge to Bada Ganpati
and Bada Ganpati to Jinsi Bus Depot)
Som Projects Pvt Ltd 11.72 11.72 9.58 81.74 Work Completed
11 Implementation of Smart Classrooms in Government Schools in Indore Bharat Sanchar Nigam Limited J/V IL&FS Education & Technology Services
Ltd.
3.00 2.67 0.72 26.97 Work Completed
12 Improvement of Roads (Mhow Naka to Tori Corner) P D Agarwal 18.46 21.31 18.94 88.88 Work Completed
13 Supp.,erect. & commis. of Tranf. Stn. Equip. 6no. Static Compac. sys. with Loading mechanm.&18n
deta
M/s TPS 22.50 36.55 25.02 68.45 Work Completed
14 Supp and establish of const & demolition waste processing plant of 100TPD capacity at Devguradiya M/s DNP Infra, Ahmedabad 1.75 1.71 1.71 100.00 Work Completed
15 Bioremediation/ Biomining  of old dumped MSW at
Devguradiya Dumping Ground
M/s Etech Projects,
Bikaner
1.50 1.50 0.94 2.44 100.00 Work Completed
16 Supp & comm of 1.0TPD cap org waste converter
machine with O&M-3yr for treat of MSW at Nehru Park
7FS  RAVI RAMASWAMY 1.00 0.51 0.40 78.43 Work Completed
17 Supp & commisng of 1.0TPD cap org waste converter machine with O&M-3yr for treatment of
MSW  at ZOO.
7FS RAVI RAMASWAMY 1.00 0.51 0.38 74.51 Work Completed
18 Supp & comm of 2.5TPD cap. Drum waste
composting mach with O&M-3yr for treat of MSW at Regional Park
7FS  RAVI RAMASWAMY 1.50 0.85 0.67 78.82 Work Completed
19 Smart parking mang (sensors, hardware, software, App devt, smart cards) for MLCP-3 LOC under PPP Mod Building Control Systems, Bangalore 2.00 2.00 Work Completed
20 Supp, inst & comm of 20TDP cap Bio-metha Plant
with O&M for treat of org MSW at Choitram Mandi- VGF
Mahindra & Mahindra Limited 7.50 7.20 7.20 100.00 Work Completed
21 Networking Work at Smart City Office, Nehru Park,
Indore
Aparajit Dhamija 0.20 0.18 0.18 100.00 Work Completed
22 Supp, inst & comm 15TPD cap Bio-methanation plant with O&M for treat of Org MSW at Kabitkhedi
on VGF
Mailhem ikos Enviroment pvt. Ltd. 7.50 6.76 4.87 72.04 Work Completed
23 Construction of Garbage Transfer near Azad Nagar,
Indore under Smart City Mission
SS Infraestate India
Pvt. Ltd.
0.92 0.83 0.52 62.65 Work Completed
24 Construction and widening of Vyas Bridge at Bada
Ganpati Indore
M/S Prabha Exim
Pvt.Ltd.
4.74 7.75 0.78 8.53 100.00 Work Completed
25 Conservation and Restoration of Krishnapura Chhatris 3.00 3.00 3.00 100.00 Work Completed
26 Solar Power plants on terraces / roofs of buildings / 160
KW
Ujaas Energy Ltd.,
Indore
0.52 0.52 0.52 100.00 Work Completed
27 Establishment of Building and Interiors for C4 D&T Constructions,
Nagda
2.41 2.93 2.91 99.32 Work Completed
28 Infrastructural & Building Development Works of 3 Schools under Smart City Mission, Indore – Group 1 M/s Anjaney developers, Indore 1.71 1.53 0.26 1.79 100.00 Work Completed
29 Infrastructural & Building Development Works of 1 School under Smart City Mission, Indore – Group 2 M/s Baba Developers, Indore 2.07 1.96 1.83 93.37 Work Completed
30 Allotment of space for advertisement on 100 Public urinals in Indore on license basis for 5 years Shukla Publicity 1.26 1.26 Work Completed
31 Allotment of space for advertisment on 80 Community/public toilets (CT/PT) in indore on license
basi
Swift Intermedia Convergence Ltd. 2.83 2.83 Work Completed
32 Civil works for Construction & Demolition collection and  transfer center at Kabitkhedi International marketing
organisation
1.57 1.39 0.94 67.63 Work Completed
33 Civil works for Construction & Demolition
collection and  transfer center at IT Park
Cementech Infra 1.24 1.08 0.15 1.23 100.00 Work Completed
34 Civil works for Construction & Demolition
collection and  transfer center at  Gandhi Nagar
Vijay pratap Sharma 1.24 1.08 1.04 96.30 Work Completed
35 Construction of  Shed for Garbage Drum compost Plant
at Regional Park
Trimula Construction 0.33 0.29 0.14 0.43 100.00 Work Completed
36 Construction of  Shed for Garbage Drum compost Plant
at Nehru Park
Vansh Construction 0.25 0.22 0.08 0.30 100.00 Work Completed
37 Construction of  Shed for Garbage Drum compost Plant
at Zoo.
Shree Tirupati Balaji
Construction
0.25 0.24 0.03 0.27 100.00 Work Completed
38 Construction of Additional shed at Garbage Transfer Station Located at Sanwer Road in sector F. Amit Steel & Industries 1.22 1.13 0.31 1.44 100.00 Work Completed
39 Construction of Shed at Garbage transfer Station located
at Dhar Road in Zone- 16
Shree Agrawal Infra 0.95 0.75 0.31 1.06 100.00 Work Completed
40 Supply of 2.0 TPD  Bio Methanation near Star Square XEON WASTE
MANAGEMENT
0.50 0.42 0.42 100.00 Work Completed
41 Civil work for construction and demolition collection and
transfer center at Ahirkhedi
KMK CONSTRUCTION 1.24 1.05 0.53 50.48 Work Completed
42 Boundary Wall Construction Work for Biomethanation
Plant at Choithram Sabji Mandi
Srajan Infra
Developers
0.22 0.19 0.03 0.22 100.00 Work Completed
43 Construction of Garbage Transfer Station near Rajshahi
Hotel, Dhakkan Wala Kua.
Amit Steel &
Industries Ltd
2.00 1.67 0.37 2.04 100.00 Work Completed
44 Civil work & covering for constr & demolit
waste treatment plant at trenching grn Nemawar road Devgu
Manish Tainguriya 2.47 2.16 2.04 94.44 Work Completed
45 Construction of Garbage Transfer Stations at Kabitkhedi,
Sanwer Road and Sirpur
United Corporation 3.30 3.30 1.55 4.85 100.00 Work Completed
46 SITC silent  DG Set with AMF Cntrl Panel, water colng based com with all accesr 30, 62.5,125 KVA DG GD Anklesaria 0.76 1.17 1.17 100.00 Work Completed
47 Construction work for Extension of Existing GTS and
other Additional Work at Sangam Nagar.
Vijay Pratap Sharma 2.00 1.78 1.63 91.57 Work Completed
48 Construction work for Extension of Existing GTS and
other Additional Work at Star Square.
Manish Tainguriya 2.36 2.11 1.20 56.87 Work Completed
49 Construction work for Extension of Existing GTS and
other Additional Work at Lalbagh.
Radhe Raj
Construction
1.11 1.00 0.87 87.00 Work Completed
50 Construction work for Extension of Existing GTS and
other Additional Work at Azad Nagar
Vijay Pratap Sharma 1.12 0.99 0.92 92.93 Work Completed
51 HT & LT Electrification including CCTV Work at New
Palasia Garbage Transfer Station
Vijay Pratap Sharma 0.16 0.13 0.53 0.66 100.00 Work Completed
52 Supp Erect & Comm of transfer Stn Equip 4n. Static Compc Sys with loadg mechn, 10 n detach con 6n Ho Hyva India Pvt Ltd 11.80 11.79 11.79 100.00 Work Completed
53 Conceptualization, designing & implementation of Heritage walk in the ABD area in Indore Smart City M/s Dharohar 0.10 0.16 0.05 31.25 Work Completed
54 Various work at Bada Ganpati square to Jinsi Work shop
Road under Indore Smart City Project
Amit Steel &
Industries
1.96 1.92 1.86 96.88 Work Completed
55 Prov, fixg, O&M of 8 Nos. Foot-Over Bridges as per spec at Indore on BOT Basis agnst Advertisement r N S Publicity, Jaipur 18.00 18.00 Work Completed
56 Chk survy, re-dsgn, Eng, Proc, Const EPC, Testng & comisng 1.5 MWp Solar PV Captive Power Kabitkhed Novus Green Energy Systems Private
Limited
6.00 6.52 6.09 93.40 Work Completed
57 Up-Gradation of Govt. Malaw Kanya Girls School Under
Smart City Mission, Indore
M/s R K. Enterprises 3.81 4.03 2.98 73.95 Work Completed
58 Installation of Smart LED street lighting with intelligent
controls  in place of existing conventional street lighting Under SCP
M/s Surya Roshni Limited 6.89 6.43 3.91 60.81 Work Completed
59 Various Work At Rajmohalla sqr to Bada Ganpati Sqr
Under Smart City Project.
MS S K SODANI 3.00 2.78 0.38 3.16 100.00 Work Completed
60 Internal and Decorative electrification work at Various
locations in Pan City , Under SCM
M/S Human Matrix 0.30 0.28 0.27 96.43 Work Completed
61 Establishment of various capacity solar PV captive Poer Plant on engineering , Procurement, construction (EPC) , Testing & Commissioning of 6 nos., 30/25 Kwp each at Sangam Nagar, Sirpur Dhar road ,sanwer road f sector
, Star Sq, IT park & New Palasia ( Group 1 &
Group 2 )
M/S Ujaas Energy Ltd. 1.76 1.39 1.21 87.05 Work Completed
62 Tender for Supply, Installation and Commissioning of 15 TPD capacity Biomethanation Plant along with 3 Years Operation and Maintenance for Treatment of Organic Municipal Solid Waste at Regional Park, Indore M/s Mailhem Ikos 6.15 5.85 2.03 34.70 Work Completed
63 Construction of boundary wall, placing of fountain, horticulture, landscape and miscellaneous civil and electrical work including 3-year O&M (fountain and horticulture) for proposed Harsiddhi park, under Smart City Mission Indore Royal Infra power Corporation 3.40 3.27 1.90 58.10 Work Completed
64 Installation of Decorative facade lighting at Krishnapura Chatri at ABD area of Indore Smart City Project M R Electrical 0.98 0.88 0.15 1.03 100.00 Work Completed
65 Slum Beautification in various zones and wards at 16
Locations, Indore
Amit Steel and
Industries
9.64 10.58 10.07 95.18 Work Completed
66 Fixing of railings in welded sections on either side of the Bridges/ Culverts in various Zones in Indore City along with cleaning of River/ Nalla bed/sides using Poclain
machine for 5 packages
Tirumala Enterprises. 7.13 8.13 5.29 65.07 Work Completed
67 Empanelment of agencies for Providing and fixing
mural, sculpture on specified place as per design approved in various parts of city
Prabhat Murti Kala Kendra, Sakshi Associates  And Mandana Graphics (Empanelment of 3
Agencies)
2.00 1.48 0.67 45.27 Work Completed
68 Empanelment of agencies for City beautification through
different type of artistic, heritage, graffiti painting work in various parts of city
KMK Construction 2.00 3.46 2.35 67.92 Work Completed
69 Supply, Install, Integration and Maintenance of Integrated Man less Automation System IMAS for Door to Door Waste Transportation Vehicles at 9 Garbage
Transfer Stations for ISCDL
Elbiz systems pvt. limited 2.43 1.99 0.20 2.19 100.00 Work Completed
70 Development and maintenance for 3 years of vertical gardens at different selected places in Indore city for
package 1 & 2
Sheel biotech limited 4.00 3.43 Work Completed
71 Operation and Maintenance of transfer station with associated equipment and vehicles for Solid Waste
Management
Inoplast Technologies 9.96 9.96 4.46 44.78 Work Completed
72 Construction of Jawahar marg bridge on River Sarasvati
,near Sanjay setu
Parshwa builders 5.00 6.88 5.92 86.05 Work Completed
73 Supply,installation,testing and commisioning of a 2 TPD capacity organic waste converter machine alongwith operation and maintenance for processing of organic MSW at Jinsi Haat for 3 years Swaaha resource management pvt.ltd. 0.60 0.74 0.39 52.70 Work Completed
74 selection of vendor for census of trees using GIS and GPS Technology and Preparation of software to operate
& Manage census data
Inforcrafts Web Solutions Private
Limited
1.80 1.04 1.04 100.00 Work Completed
75 Engagement of transaction advisor for supervision
,monitoring ,development and management of municipal cororation indore swachh card management system
M/s Creative company 1.60 1.60 0.53 33.13 Work Completed
76 Supply of 10 Nos. waste bottle compaction with reverse
vending machine
M/s Biocrux India Pvt.
Ltd.
0.50 0.50 0.14 28.00 Work Completed
77 Operation and maintenance of 200 TPD material recovery facility for dry municipal waste generated in Indore for 3 years at MRF-2 Devguradia Human Matrix securities 1.00 0.51 Work Completed
78 Balance Civil works at Garbage transfer station Sanwer
road -F sector
Vansh construction 0.40 0.39 0.39 100.00 Work Completed
79 External electrification work of HT/LT line and
transformer and line shifting in ABD area and PAN city area under SCM
Vijay Pratap Sharma 0.73 0.97 0.96 98.97 Work Completed
80 HT line Extension, Installation ,Testing & Commisioning of 200 KVA Transformer at Choithram Mandi, Biomethenization plant under Swachh Bharat
Mission
M/s P.N. singh Engineer and Contractor 0.05 0.05 0.05 100.00 Work Completed
81 Construction of hall on 2nd floor of existing ISCDL Office
building ,Nehru park
Vansh construction 0.18 0.16 0.15 93.75 Work Completed
82 Renovation of Existing building ,construction of toilet block,shed and miscellaneous civil, electrical work, interior work in Indore Smart City office,Nehru park Vansh Construction 0.12 0.15 0.15 100.00 Work Completed
83 Supply, Installations, Testing and Commisioning 20 KVA UPS & 3 KVA Inverter with Comprehensive Annual Maintenance Contract for a period of 3 Years M/s R.K. Jain 0.10 0.09 0.08 88.89 Work Completed
84 Construction of additional work at GTS IT Park ,Indore Tirumala construction 0.36 0.43 0.42 97.67 Work Completed
85 HT Line extension & installation ,Testing and
Commisioning of 100 KVA transformer, Garbage Transfer Station at Lal Baag Indore under SCM
M/s Nitin Jain-N.K. Electricals 0.11 0.09 0.06 66.67 Work Completed
86 Energy efficient Led street lighting with smart controls in ABD area and its Peripheral areas under SCM-additional
work
Surya Roshni Limited 2.62 2.62 Work Completed
87 External Electrification work of HT/LT line and
Transformer ,Line shifting at various places at ABD and PAN City Indore , Phase 2
M/S Vijay Pratap Sharma 0.24 0.24 Work Completed
88 Additional work at Kabitkhedi Garbage Transfer Station for Construction of Office ,Road side railings ,leachate
tank and other subsidiary work
Shri Satguru Sai Enterprises 0.49 0.47 0.45 95.74 Work Completed
89 Construction of Garbage Transfer Station at New
Palasia.
Amar construction 0.49 0.49 0.49 100.00 Work Completed
90 Construction of obstructive temples in Road width at Mhow Naka to Biyabani Square under SCM Baijnath Prasad Jaiswal 0.30 0.48 0.43 89.58 Work Completed
91 Selection of Agencies for Supply ,Installation ,Operations and Maintenance of 1000 LPH Capacity Water Purifier & Cooler at 100 Locations in Indore M/s KNB Wealth Solution Pvt.Ltd. 3.50 3.87 3.74 96.64 Work Completed
92 Supply, Eraction, Commisioning, Installation and Testing of 2 No. passanger Elevators/Lift with 3 Years Maintenance for various Locations under SCM M/s ORBIS Elevator Co. Ltd. 0.30 0.30 Work Completed
93 Supply and Installation of Energy Efficient LED street
Lighting with Smart Controls in various wards in Pan City Indore under SCM-Package 1
M/s N.K. Electricals 13.42 15.89 11.99 75.46 Work Completed
94 Total Station Survey of the old garbage at Devguradia
Trenching ground
M/s SNS Associates
,Indore
0.05 0.05 0.05 100.00 Work Completed
TOTAL COST 306.73