SL. | Project Name | Implementing Agency | DPR Cost / Estimated Project Cost | Cost as per Work Order | Extra Work Order | Financial Progress ( in Lakhs) | Financial Progress (%) | PROJECT STATUS |
1 | Riverfront development works between Rambag Bridge to Krishnapura Bridge under Smart City Mission | Vijay Pratap Sharma | 4.00 | 3.57 | – | 2.99 | 83.75 | Work Completed |
2 | Improvement of Roads (Raj Mohalla to Bada Ganpati) | Som Projects Pvt Ltd | 10.44 | 10.44 | – | 6.14 | 58.81 | Work Completed |
3 | Supply, Installation, Implementation and Maintenance of GPS based Vehicle Tracking Solution (VTS) for Municipal Solid Waste (MSW), CCTV Cameras at Community & Public Toilets and Integration of Weighbridge at Devguradia Landfill Site | Bio-enable Technologies Pvt. Ltd. Pune | 1.50 | 1.29 | 0.18 | 1.47 | 100.00 | Work Completed |
4 | Construction of Chandrabhaga Bridge | Parshwa Builders | 3.56 | 5.03 | 1.25 | 6.28 | 100.00 | Work Completed |
5 | Construction of Central Median and Erection of Electrical Pole on Biyabani Road & Subhash Marg, Indore. |
HPL Electric & Power Pvt Ltd | 2.50 | 3.29 | – | 2.38 | 72.34 | Work Completed |
6 | Construction of Garbage Transfer Station at Sangam Nagar under Smart City Mission |
Vijay Pratap Sharma | 1.34 | 1.07 | 0.25 | 1.32 | 100.00 | Work Completed |
7 | Construction of Garbage Transfer Station at IT Park Indore under Smart City Mission |
SS Infraestate India Pvt. Ltd. |
1.70 | 1.36 | – | 1.14 | 83.82 | Work Completed |
8 | Construction of Garbage Transfer Station at Star Square MR-10 Indore under Smart City Mission |
Manish Tainguriya | 1.45 | 1.12 | 0.26 | 1.38 | 100.00 | Work Completed |
9 | Construction of Garbage Transfer Station at Lalbag Indore under Smart City Mission |
SS Infraestate India Pvt. Ltd. |
1.23 | 0.99 | 0.30 | 1.29 | 100.00 | Work Completed |
10 | Improvement of Roads (Vyas Bridge to Bada Ganpati and Bada Ganpati to Jinsi Bus Depot) |
Som Projects Pvt Ltd | 11.72 | 11.72 | – | 9.58 | 81.74 | Work Completed |
11 | Implementation of Smart Classrooms in Government Schools in Indore | Bharat Sanchar Nigam Limited J/V IL&FS Education & Technology Services Ltd. |
3.00 | 2.67 | – | 0.72 | 26.97 | Work Completed |
12 | Improvement of Roads (Mhow Naka to Tori Corner) | P D Agarwal | 18.46 | 21.31 | – | 18.94 | 88.88 | Work Completed |
13 | Supp.,erect. & commis. of Tranf. Stn. Equip. 6no. Static Compac. sys. with Loading mechanm.&18n deta |
M/s TPS | 22.50 | 36.55 | – | 25.02 | 68.45 | Work Completed |
14 | Supp and establish of const & demolition waste processing plant of 100TPD capacity at Devguradiya | M/s DNP Infra, Ahmedabad | 1.75 | 1.71 | – | 1.71 | 100.00 | Work Completed |
15 | Bioremediation/ Biomining of old dumped MSW at Devguradiya Dumping Ground |
M/s Etech Projects, Bikaner |
1.50 | 1.50 | 0.94 | 2.44 | 100.00 | Work Completed |
16 | Supp & comm of 1.0TPD cap org waste converter machine with O&M-3yr for treat of MSW at Nehru Park |
7FS RAVI RAMASWAMY | 1.00 | 0.51 | – | 0.40 | 78.43 | Work Completed |
17 | Supp & commisng of 1.0TPD cap org waste converter machine with O&M-3yr for treatment of MSW at ZOO. |
7FS RAVI RAMASWAMY | 1.00 | 0.51 | – | 0.38 | 74.51 | Work Completed |
18 | Supp & comm of 2.5TPD cap. Drum waste composting mach with O&M-3yr for treat of MSW at Regional Park |
7FS RAVI RAMASWAMY | 1.50 | 0.85 | – | 0.67 | 78.82 | Work Completed |
19 | Smart parking mang (sensors, hardware, software, App devt, smart cards) for MLCP-3 LOC under PPP Mod | Building Control Systems, Bangalore | 2.00 | 2.00 | – | – | – | Work Completed |
20 | Supp, inst & comm of 20TDP cap Bio-metha Plant with O&M for treat of org MSW at Choitram Mandi- VGF |
Mahindra & Mahindra Limited | 7.50 | 7.20 | – | 7.20 | 100.00 | Work Completed |
21 | Networking Work at Smart City Office, Nehru Park, Indore |
Aparajit Dhamija | 0.20 | 0.18 | – | 0.18 | 100.00 | Work Completed |
22 | Supp, inst & comm 15TPD cap Bio-methanation plant with O&M for treat of Org MSW at Kabitkhedi on VGF |
Mailhem ikos Enviroment pvt. Ltd. | 7.50 | 6.76 | – | 4.87 | 72.04 | Work Completed |
23 | Construction of Garbage Transfer near Azad Nagar, Indore under Smart City Mission |
SS Infraestate India Pvt. Ltd. |
0.92 | 0.83 | – | 0.52 | 62.65 | Work Completed |
24 | Construction and widening of Vyas Bridge at Bada Ganpati Indore |
M/S Prabha Exim Pvt.Ltd. |
4.74 | 7.75 | 0.78 | 8.53 | 100.00 | Work Completed |
25 | Conservation and Restoration of Krishnapura Chhatris | 3.00 | 3.00 | – | 3.00 | 100.00 | Work Completed | |
26 | Solar Power plants on terraces / roofs of buildings / 160 KW |
Ujaas Energy Ltd., Indore |
0.52 | 0.52 | – | 0.52 | 100.00 | Work Completed |
27 | Establishment of Building and Interiors for C4 | D&T Constructions, Nagda |
2.41 | 2.93 | – | 2.91 | 99.32 | Work Completed |
28 | Infrastructural & Building Development Works of 3 Schools under Smart City Mission, Indore – Group 1 | M/s Anjaney developers, Indore | 1.71 | 1.53 | 0.26 | 1.79 | 100.00 | Work Completed |
29 | Infrastructural & Building Development Works of 1 School under Smart City Mission, Indore – Group 2 | M/s Baba Developers, Indore | 2.07 | 1.96 | – | 1.83 | 93.37 | Work Completed |
30 | Allotment of space for advertisement on 100 Public urinals in Indore on license basis for 5 years | Shukla Publicity | 1.26 | 1.26 | – | – | – | Work Completed |
31 | Allotment of space for advertisment on 80 Community/public toilets (CT/PT) in indore on license basi |
Swift Intermedia Convergence Ltd. | 2.83 | 2.83 | – | – | – | Work Completed |
32 | Civil works for Construction & Demolition collection and transfer center at Kabitkhedi | International marketing organisation |
1.57 | 1.39 | – | 0.94 | 67.63 | Work Completed |
33 | Civil works for Construction & Demolition collection and transfer center at IT Park |
Cementech Infra | 1.24 | 1.08 | 0.15 | 1.23 | 100.00 | Work Completed |
34 | Civil works for Construction & Demolition collection and transfer center at Gandhi Nagar |
Vijay pratap Sharma | 1.24 | 1.08 | – | 1.04 | 96.30 | Work Completed |
35 | Construction of Shed for Garbage Drum compost Plant at Regional Park |
Trimula Construction | 0.33 | 0.29 | 0.14 | 0.43 | 100.00 | Work Completed |
36 | Construction of Shed for Garbage Drum compost Plant at Nehru Park |
Vansh Construction | 0.25 | 0.22 | 0.08 | 0.30 | 100.00 | Work Completed |
37 | Construction of Shed for Garbage Drum compost Plant at Zoo. |
Shree Tirupati Balaji Construction |
0.25 | 0.24 | 0.03 | 0.27 | 100.00 | Work Completed |
38 | Construction of Additional shed at Garbage Transfer Station Located at Sanwer Road in sector F. | Amit Steel & Industries | 1.22 | 1.13 | 0.31 | 1.44 | 100.00 | Work Completed |
39 | Construction of Shed at Garbage transfer Station located at Dhar Road in Zone- 16 |
Shree Agrawal Infra | 0.95 | 0.75 | 0.31 | 1.06 | 100.00 | Work Completed |
40 | Supply of 2.0 TPD Bio Methanation near Star Square | XEON WASTE MANAGEMENT |
0.50 | 0.42 | – | 0.42 | 100.00 | Work Completed |
41 | Civil work for construction and demolition collection and transfer center at Ahirkhedi |
KMK CONSTRUCTION | 1.24 | 1.05 | – | 0.53 | 50.48 | Work Completed |
42 | Boundary Wall Construction Work for Biomethanation Plant at Choithram Sabji Mandi |
Srajan Infra Developers |
0.22 | 0.19 | 0.03 | 0.22 | 100.00 | Work Completed |
43 | Construction of Garbage Transfer Station near Rajshahi Hotel, Dhakkan Wala Kua. |
Amit Steel & Industries Ltd |
2.00 | 1.67 | 0.37 | 2.04 | 100.00 | Work Completed |
44 | Civil work & covering for constr & demolit waste treatment plant at trenching grn Nemawar road Devgu |
Manish Tainguriya | 2.47 | 2.16 | – | 2.04 | 94.44 | Work Completed |
45 | Construction of Garbage Transfer Stations at Kabitkhedi, Sanwer Road and Sirpur |
United Corporation | 3.30 | 3.30 | 1.55 | 4.85 | 100.00 | Work Completed |
46 | SITC silent DG Set with AMF Cntrl Panel, water colng based com with all accesr 30, 62.5,125 KVA DG | GD Anklesaria | 0.76 | 1.17 | – | 1.17 | 100.00 | Work Completed |
47 | Construction work for Extension of Existing GTS and other Additional Work at Sangam Nagar. |
Vijay Pratap Sharma | 2.00 | 1.78 | – | 1.63 | 91.57 | Work Completed |
48 | Construction work for Extension of Existing GTS and other Additional Work at Star Square. |
Manish Tainguriya | 2.36 | 2.11 | – | 1.20 | 56.87 | Work Completed |
49 | Construction work for Extension of Existing GTS and other Additional Work at Lalbagh. |
Radhe Raj Construction |
1.11 | 1.00 | – | 0.87 | 87.00 | Work Completed |
50 | Construction work for Extension of Existing GTS and other Additional Work at Azad Nagar |
Vijay Pratap Sharma | 1.12 | 0.99 | – | 0.92 | 92.93 | Work Completed |
51 | HT & LT Electrification including CCTV Work at New Palasia Garbage Transfer Station |
Vijay Pratap Sharma | 0.16 | 0.13 | 0.53 | 0.66 | 100.00 | Work Completed |
52 | Supp Erect & Comm of transfer Stn Equip 4n. Static Compc Sys with loadg mechn, 10 n detach con 6n Ho | Hyva India Pvt Ltd | 11.80 | 11.79 | – | 11.79 | 100.00 | Work Completed |
53 | Conceptualization, designing & implementation of Heritage walk in the ABD area in Indore Smart City | M/s Dharohar | 0.10 | 0.16 | – | 0.05 | 31.25 | Work Completed |
54 | Various work at Bada Ganpati square to Jinsi Work shop Road under Indore Smart City Project |
Amit Steel & Industries |
1.96 | 1.92 | – | 1.86 | 96.88 | Work Completed |
55 | Prov, fixg, O&M of 8 Nos. Foot-Over Bridges as per spec at Indore on BOT Basis agnst Advertisement r | N S Publicity, Jaipur | 18.00 | 18.00 | – | – | – | Work Completed |
56 | Chk survy, re-dsgn, Eng, Proc, Const EPC, Testng & comisng 1.5 MWp Solar PV Captive Power Kabitkhed | Novus Green Energy Systems Private Limited |
6.00 | 6.52 | – | 6.09 | 93.40 | Work Completed |
57 | Up-Gradation of Govt. Malaw Kanya Girls School Under Smart City Mission, Indore |
M/s R K. Enterprises | 3.81 | 4.03 | – | 2.98 | 73.95 | Work Completed |
58 | Installation of Smart LED street lighting with intelligent controls in place of existing conventional street lighting Under SCP |
M/s Surya Roshni Limited | 6.89 | 6.43 | – | 3.91 | 60.81 | Work Completed |
59 | Various Work At Rajmohalla sqr to Bada Ganpati Sqr Under Smart City Project. |
MS S K SODANI | 3.00 | 2.78 | 0.38 | 3.16 | 100.00 | Work Completed |
60 | Internal and Decorative electrification work at Various locations in Pan City , Under SCM |
M/S Human Matrix | 0.30 | 0.28 | – | 0.27 | 96.43 | Work Completed |
61 | Establishment of various capacity solar PV captive Poer Plant on engineering , Procurement, construction (EPC) , Testing & Commissioning of 6 nos., 30/25 Kwp each at Sangam Nagar, Sirpur Dhar road ,sanwer road f sector , Star Sq, IT park & New Palasia ( Group 1 & Group 2 ) |
M/S Ujaas Energy Ltd. | 1.76 | 1.39 | – | 1.21 | 87.05 | Work Completed |
62 | Tender for Supply, Installation and Commissioning of 15 TPD capacity Biomethanation Plant along with 3 Years Operation and Maintenance for Treatment of Organic Municipal Solid Waste at Regional Park, Indore | M/s Mailhem Ikos | 6.15 | 5.85 | – | 2.03 | 34.70 | Work Completed |
63 | Construction of boundary wall, placing of fountain, horticulture, landscape and miscellaneous civil and electrical work including 3-year O&M (fountain and horticulture) for proposed Harsiddhi park, under Smart City Mission Indore | Royal Infra power Corporation | 3.40 | 3.27 | – | 1.90 | 58.10 | Work Completed |
64 | Installation of Decorative facade lighting at Krishnapura Chatri at ABD area of Indore Smart City Project | M R Electrical | 0.98 | 0.88 | 0.15 | 1.03 | 100.00 | Work Completed |
65 | Slum Beautification in various zones and wards at 16 Locations, Indore |
Amit Steel and Industries |
9.64 | 10.58 | – | 10.07 | 95.18 | Work Completed |
66 | Fixing of railings in welded sections on either side of the Bridges/ Culverts in various Zones in Indore City along with cleaning of River/ Nalla bed/sides using Poclain machine for 5 packages |
Tirumala Enterprises. | 7.13 | 8.13 | – | 5.29 | 65.07 | Work Completed |
67 | Empanelment of agencies for Providing and fixing mural, sculpture on specified place as per design approved in various parts of city |
Prabhat Murti Kala Kendra, Sakshi Associates And Mandana Graphics (Empanelment of 3 Agencies) |
2.00 | 1.48 | – | 0.67 | 45.27 | Work Completed |
68 | Empanelment of agencies for City beautification through different type of artistic, heritage, graffiti painting work in various parts of city |
KMK Construction | 2.00 | 3.46 | – | 2.35 | 67.92 | Work Completed |
69 | Supply, Install, Integration and Maintenance of Integrated Man less Automation System IMAS for Door to Door Waste Transportation Vehicles at 9 Garbage Transfer Stations for ISCDL |
Elbiz systems pvt. limited | 2.43 | 1.99 | 0.20 | 2.19 | 100.00 | Work Completed |
70 | Development and maintenance for 3 years of vertical gardens at different selected places in Indore city for package 1 & 2 |
Sheel biotech limited | 4.00 | 3.43 | – | – | – | Work Completed |
71 | Operation and Maintenance of transfer station with associated equipment and vehicles for Solid Waste Management |
Inoplast Technologies | 9.96 | 9.96 | – | 4.46 | 44.78 | Work Completed |
72 | Construction of Jawahar marg bridge on River Sarasvati ,near Sanjay setu |
Parshwa builders | 5.00 | 6.88 | – | 5.92 | 86.05 | Work Completed |
73 | Supply,installation,testing and commisioning of a 2 TPD capacity organic waste converter machine alongwith operation and maintenance for processing of organic MSW at Jinsi Haat for 3 years | Swaaha resource management pvt.ltd. | 0.60 | 0.74 | – | 0.39 | 52.70 | Work Completed |
74 | selection of vendor for census of trees using GIS and GPS Technology and Preparation of software to operate & Manage census data |
Inforcrafts Web Solutions Private Limited |
1.80 | 1.04 | – | 1.04 | 100.00 | Work Completed |
75 | Engagement of transaction advisor for supervision ,monitoring ,development and management of municipal cororation indore swachh card management system |
M/s Creative company | 1.60 | 1.60 | – | 0.53 | 33.13 | Work Completed |
76 | Supply of 10 Nos. waste bottle compaction with reverse vending machine |
M/s Biocrux India Pvt. Ltd. |
0.50 | 0.50 | – | 0.14 | 28.00 | Work Completed |
77 | Operation and maintenance of 200 TPD material recovery facility for dry municipal waste generated in Indore for 3 years at MRF-2 Devguradia | Human Matrix securities | 1.00 | 0.51 | – | – | – | Work Completed |
78 | Balance Civil works at Garbage transfer station Sanwer road -F sector |
Vansh construction | 0.40 | 0.39 | – | 0.39 | 100.00 | Work Completed |
79 | External electrification work of HT/LT line and transformer and line shifting in ABD area and PAN city area under SCM |
Vijay Pratap Sharma | 0.73 | 0.97 | – | 0.96 | 98.97 | Work Completed |
80 | HT line Extension, Installation ,Testing & Commisioning of 200 KVA Transformer at Choithram Mandi, Biomethenization plant under Swachh Bharat Mission |
M/s P.N. singh Engineer and Contractor | 0.05 | 0.05 | – | 0.05 | 100.00 | Work Completed |
81 | Construction of hall on 2nd floor of existing ISCDL Office building ,Nehru park |
Vansh construction | 0.18 | 0.16 | – | 0.15 | 93.75 | Work Completed |
82 | Renovation of Existing building ,construction of toilet block,shed and miscellaneous civil, electrical work, interior work in Indore Smart City office,Nehru park | Vansh Construction | 0.12 | 0.15 | – | 0.15 | 100.00 | Work Completed |
83 | Supply, Installations, Testing and Commisioning 20 KVA UPS & 3 KVA Inverter with Comprehensive Annual Maintenance Contract for a period of 3 Years | M/s R.K. Jain | 0.10 | 0.09 | – | 0.08 | 88.89 | Work Completed |
84 | Construction of additional work at GTS IT Park ,Indore | Tirumala construction | 0.36 | 0.43 | – | 0.42 | 97.67 | Work Completed |
85 | HT Line extension & installation ,Testing and Commisioning of 100 KVA transformer, Garbage Transfer Station at Lal Baag Indore under SCM |
M/s Nitin Jain-N.K. Electricals | 0.11 | 0.09 | – | 0.06 | 66.67 | Work Completed |
86 | Energy efficient Led street lighting with smart controls in ABD area and its Peripheral areas under SCM-additional work |
Surya Roshni Limited | 2.62 | 2.62 | – | – | – | Work Completed |
87 | External Electrification work of HT/LT line and Transformer ,Line shifting at various places at ABD and PAN City Indore , Phase 2 |
M/S Vijay Pratap Sharma | 0.24 | 0.24 | – | – | – | Work Completed |
88 | Additional work at Kabitkhedi Garbage Transfer Station for Construction of Office ,Road side railings ,leachate tank and other subsidiary work |
Shri Satguru Sai Enterprises | 0.49 | 0.47 | – | 0.45 | 95.74 | Work Completed |
89 | Construction of Garbage Transfer Station at New Palasia. |
Amar construction | 0.49 | 0.49 | – | 0.49 | 100.00 | Work Completed |
90 | Construction of obstructive temples in Road width at Mhow Naka to Biyabani Square under SCM | Baijnath Prasad Jaiswal | 0.30 | 0.48 | – | 0.43 | 89.58 | Work Completed |
91 | Selection of Agencies for Supply ,Installation ,Operations and Maintenance of 1000 LPH Capacity Water Purifier & Cooler at 100 Locations in Indore | M/s KNB Wealth Solution Pvt.Ltd. | 3.50 | 3.87 | – | 3.74 | 96.64 | Work Completed |
92 | Supply, Eraction, Commisioning, Installation and Testing of 2 No. passanger Elevators/Lift with 3 Years Maintenance for various Locations under SCM | M/s ORBIS Elevator Co. Ltd. | 0.30 | 0.30 | – | – | – | Work Completed |
93 | Supply and Installation of Energy Efficient LED street Lighting with Smart Controls in various wards in Pan City Indore under SCM-Package 1 |
M/s N.K. Electricals | 13.42 | 15.89 | – | 11.99 | 75.46 | Work Completed |
94 | Total Station Survey of the old garbage at Devguradia Trenching ground |
M/s SNS Associates ,Indore |
0.05 | 0.05 | – | 0.05 | 100.00 | Work Completed |
TOTAL COST | 306.73 |