Sr. No. | Project Name | Cost of Work (INR in Crores) |
Work Status |
1 | Fixing of railings in welded sections on either side of the Bridges Culverts in various Zones in Indore City along with cleaning of River Nalla bed sides using Poclain machine for 5 packages | 5.83 | Completed |
2 | Empanelment of agencies for Providing and fixing mural, sculpture on specified place as per design approved in various parts of city | 1.00 | Completed |
3 | Empanelment of agencies for City beautification through different type of artistic, heritage, graffiti painting work in various parts of city | 2.57 | Completed |
4 | Development and maintenance for 3 years of vertical gardens at different selected places in Indore city for package 1 and 2 | 3.43 | Completed |
5 | Infrastructure Upgradation and Improvement for Commuter Safety under SCM. | 23.39 | Completed |
6 | SITC silent DG Set with AMF Cntrl Panel, water colng based com with all accesr 30, 62.5,125 KVA DG | 1.17 | Completed |
7 | Internal and Decorative electrification work at Various locations in Pan City , Under SCM | 0.27 | Completed |
8 | Installation of Decorative facade lighting at Krishnapura Chatri at ABD area of Indore Smart City Project | 1.14 | Completed |
9 | External electrification work of HT LT line and transformer and line shifting in ABD area and PAN city area under SCM | 0.97 | Completed |
10 | HT line Extension, Installation, Testing and Commisioning of 200 KVA Transformer at Choithram Mandi, Biomethenization plant under Swachh Bharat Mission | 0.05 | Completed |
11 | External Electrification Work of HT LT Line and Transformer, Line-Shifting at Various Places in ABD and Pan City Indore under Indore Smart City Phase 2 | 0.75 | Completed |
12 | Construction of Road, Drain, Retaining wall, Boundary wall, garden development, drip irrigation system, electrification and miscellaneous work in Lalbagh Campus Indore | 1.80 | Completed |
13 | Built Heritage Conservation Gopal Mandir | 17.43 | Completed |
14 | Built Heritage Conservation Chhatri Bagh, Hari Rao Holkar Chhatri | 4.42 | Completed |
15 | Conservation, Restoration Redevelopment of Rajwada, Indore | 17.22 | Completed |
16 | Heritage Shopping Complex G Plus 2 work at Gopal Mandir Premises. | 8.64 | Completed |
17 | “Conservation, restoration and redevelopment of Boliya Sarkar Chattri under Smart City Mission | 4.27 | Completed |
18 | Conservation, restoration and redevelopment of Malhar rao chhatri,chhatribagh,indore | 4.74 | Completed |
19 | Conservation and Restoration of Gandhi hall | 6.38 | Completed |
20 | Auxiliary Buildings and Revitalization of Gandhi Hall Campus | 9.28 | Completed |
21 | Implementation of Command Control and Communications Centre | 39.20 | Completed |
22 | Common Cloud Servieces | 9.61 | Completed |
23 | Establishment of Building and Interiors for C4 | 3.30 | Completed |
24 | Supply, Eraction, Commisioning, Installation and Testing of 2 No. passanger Elevators Lift with 3 Years Maintenance for various Locations under SCM | 0.34 | Completed |
25 | Interior, Civil, Electrical, Airconditioning, Firefighting and other miscellaneous works in under construction ICCC building, AICTSL campus Indore. | 5.81 | Completed |
26 | Boundry wall, Road, Passenger Lift and other miscellaneous works for ICCC building, AICTSL Campus, Indore | 2.30 | Completed |
27 | Construction of Roof Shed at ICCC Building in AICTSL Campus | 0.27 | Completed |
28 | Operation and Management of Incubation Centre/smart seed Indore | 2.10 | Completed |
29 | Temporary installation of CCTV camera and optical fiber cable during low and order situation in Indore city. | 0.89 | Completed |
30 | Supply, Laying, Operation and Maintenance, OandM for 6 months of Optical fiber Network for Indore City | 1.23 | Completed |
31 | Redevelopment of Jinsi Haat Bazaar and Construction of Ancillary Buildings | 8.68 | Completed |
32 | Installation of Smart LED street lighting with intelligent controls in place of existing conventional street lighting Under SCP | 9.52 | Completed |
33 | Supply and Installation of Energy Efficient LED street Lighting with Smart Controls in various wards in Pan City Indore under SCM-Package 1 | 14.86 | Completed |
34 | Supply, Installation, Testing, Commissioning with PIXEL controlled LED Luminaries and Integration of Automation computer server with control and simulation of Lighting Effects in food street 56 Dukan Under Indore Smart City Mission | 2.51 | Completed |
35 | Place making and visual improvement for selected roads junctions of Indore in 10 different packages Pac-2 | 3.74 | Completed |
36 | Place making and visual improvement for selected roads junctions of Indore in 10 different packages Pac-3 | 5.35 | Completed |
37 | Place making and visual improvement for selected roads junctions of Indore in 10 different packages Pac 04 | 6.43 | Completed |
38 | Place making and visual improvement for selected roads junctions of Indore in 10 different packages Pac-5 | 3.36 | Completed |
39 | Place making and visual improvement for selected roads junctions of Indore in 10 different packages Pac.06 | 1.60 | Completed |
40 | Place making and visual improvement for selected roads junctions of Indore in 10 different packages Pac-07 | 4.69 | Completed |
41 | Place making and visual improvement for selected roads junctions of Indore in 10 different packages Pac-08 | 3.06 | Completed |
42 | Place making and visual improvement for selected roads junctions of Indore in 10 different packages Pac09 | 0.79 | Completed |
43 | Place making and visual improvement for selected roads junctions of Indore in 10 different packages Pac 10 | 0.55 | Completed |
44 | Selection of Concessionaire to Design, Develop, Implement, Operate, Maintain and Transfer of Two-Wheeler Parking in Indore city on PPP Basis | A. 200 Nos. Two -Wheeler parking at Yashwant Ganj, M.G. Road, B. 50 Nos.Two-Wheeler Parking in ABD | 3.54 | Completed |
45 | Construction of Modular Type Rain Water Harvesting System Storm Water Management by using Copolymer based Cross Wave Technology at various location in Indore city | 7.53 | Completed |
46 | Riverfront development works between Rambag Bridge to Krishnapura Bridge under Smart City Mission | 3.44 | Completed |
47 | Riverfront Development – Chandrabhaga Bridge to Harsiddhi Bridge and Harsiddhi Park | 4.42 | Completed |
48 | RF and Park Devlp Works betn Krishnapura Bridge to Jawahar Marg Bridge, Const of Parking Fac and Shops | 26.65 | Completed |
49 | Riverfront Development – Gangour Bridge to Jairam Bridge | 10.28 | Completed |
50 | Construction of boundary wall, placing of fountain, horticulture, landscape and miscellaneous civil and electrical work including 3-year OandM, fountain and horticulture for proposed Harsiddhi park, under Smart City Mission Indore | 3.66 | Completed |
51 | Supply, Installation, Testing and Commissioning of 11KV and LT Underground Cabling System with Compact Substation on Biyabani and Subhash Marg, Indore under Smart City Mission | 12.17 | Completed |
52 | Improvement of Roads, Raj Mohalla to Bada Ganpati | 6.29 | Completed |
53 | Construction of Chandrabhaga Bridge | 6.28 | Completed |
54 | Construction of Central Median and Erection of Electrical Pole on Biyabani Road and Subhash Marg, Indore. | 2.66 | Completed |
55 | Improvement of Roads, Vyas Bridge to Bada Ganpati and Bada Ganpati to Jinsi Bus Depot | 10.01 | Completed |
56 | Improvement of Roads, Mhow Naka to Tori Corner | 21.31 | Completed |
57 | U.G.cabling elec.work in ABD area with Comp. Sub stn. and SCADA sys. with related grid SS upgrad. work | 2.60 | Completed |
58 | Construction and widening of Vyas Bridge at Bada Ganpati Indore | 8.49 | Completed |
59 | U.G.cabl elec.work in ABD with Comp. Sub stn.and SCADA sys. with related grid SS upgrad. Work balance | 0.30 | Completed |
60 | Various work at Bada Ganpati square to Jinsi Work shop Road under Indore Smart City Project | 1.99 | Completed |
61 | U.G Cabling with Compact Type Sub-Stations for Silawatpura Dargah to Chandrabhaga Bridge Package -2 | 8.87 | Completed |
62 | UG Cabling with Compact Type Sub-Stns for Jawahar Marg Raj Mohalla sq.- Sanjay setu Bridge Package-3 | 2.47 | Completed |
63 | Various Work At Rajmohalla sqr to Bada Ganpati Sqr Under Smart City Project. | 3.16 | Completed |
64 | Smart Road Network including Construction of Central Median, laying of Electrical RCC duct, OFC duct, storm water duct, shifting of existing overhead electrical line and various miscellaneous work in ABD area- Phase-V | 77.07 | Completed |
65 | Construction of Jawahar marg bridge on River Sarasvati ,near Sanjay setu | 5.92 | Completed |
66 | Construction of religious structure obstructing in widening of Gangwal to Chanddrabhaga Road | 1.33 | Completed |
67 | Development of integrated smart road network in ABD area under smart city mission,Package 4 | 62.50 | Completed |
68 | Construction of obstructive temples in Road width at Mhow Naka to Biyabani Square under SCM | 0.49 | Completed |
69 | Miscellaneous Civil Work at Chhatripura Thana Indore | 0.94 | Completed |
70 | Infrastructural and Building Development Works of 3 Schools under Smart City Mission, Indore – Group 1 | 1.90 | Completed |
71 | Infrastructural and Building Development Works of 1 School under Smart City Mission, Indore – Group 2 | 1.96 | Completed |
72 | Infrastructural and Building Development Works of 3 Schools under Smart City Mission, Indore – Group 3 | 2.18 | Completed |
73 | Up-Gradation of Govt. Malaw Kanya Girls School Under Smart City Mission, Indore | 4.22 | Completed |
74 | Development of Laxman Singh Gaud School | 1.85 | Completed |
75 | Construction of Sludge Irradiation Plant for Sludge hygienisation near STP at Kabitkhedi, Indore | 14.84 | Completed |
76 | Design, Procurement, Installation and Commissioning of plant and machinery for 1500 kci Gamma Radiation processing unit for Dry city sludge hygienisation and fortification for agricultural applications at STP plant, Khasra no.27, Villege Kabitkhedi | 9.12 | Completed |
77 | Supply,Installation & Commissioning of BIO-NPK unit at Sludge Hyginisation Plant near STP at Kabitkhedi with 3 year O&M | 0.50 | Completed |
78 | Slum Beautification in various zones and wards at 16 Locations, Indore | 10.17 | Completed |
79 | Implementation of Smart Classrooms in Government Schools in Indore | 2.67 | Completed |
80 | GPS Based -Human efficiency tracking system, imTrac soft solution | 16.42 | Completed |
81 | Solar Power plants on terraces roofs of buildings 160 KW | 0.52 | Completed |
82 | Chk survy, re-dsgn, Eng, Proc, Const EPC, Testng and comisng 1.5 MWp Solar PV Captive Power Kabitkhed | 7.01 | Completed |
83 | Establishment of various capacity solar PV captive Poer Plant on engineering, Procurement, construction, EPC, Testing and Commissioning of 6 nos., 30 25 Kwp each at Sangam Nagar. | 1.30 | Completed |
84 | Selection of consultancy and preparation of RFP for Supply Testing Commissioning of grid Connected Solar PV generating plants at Various locations under Smart City Projects | 0.21 | Completed |
85 | Design,providing ,fixing & commissioning of estimated cumulative capacity 58KWP grid connected solar connected solar pv captive roof top power plant at control and command centre AICTSL Indore, with 5 years years comprehensive operation and maintenance | 0.25 | Completed |
86 | Supply, Installation, Implementation and Maintenance of GPS based Vehicle Tracking Solution, VTS for Municipal Solid Waste, MSW, CCTV Cameras at Community and Public Toilets and Integration of Weighbridge at Devguradia Landfill Site | 1.47 | Completed |
87 | Construction of Garbage Transfer Station at Sangam Nagar under Smart City Mission | 1.29 | Completed |
88 | Construction of Garbage Transfer Station at IT Park Indore under Smart City Mission | 1.27 | Completed |
89 | Construction of Garbage Transfer Station at Star Square MR-10 Indore under Smart City Mission | 1.38 | Completed |
90 | Construction of Garbage Transfer Station at Lalbag Indore under Smart City Mission | 1.16 | Completed |
91 | Design, Develp., implementation and 0andM of Integrated SWM inc. Aadhar-based Biometric attd. syst. | 9.34 | Completed |
92 | Covid Application | 0.40 | Completed |
93 | Supp., erect. and commis. of Tranf. Stn. Equip. 6no. Static Compac. sys. with Loading mechanm.and18n deta | 25.02 | Completed |
94 | Supp and establish of const and demolition waste processing plant of 100TPD capacity at Devguradiya | 1.71 | Completed |
95 | Bioremediation Biomining of old dumped MSW at Devguradiya Dumping Ground | 2.44 | Completed |
96 | Supp and comm of 1.0TPD cap org waste converter machine with OandM-3yr for treat of MSW at Nehru Park | 0.51 | Completed |
97 | Supp and commisng of 1.0TPD cap org waste converter machine with OandM-3yr for treatment of MSW at ZOO. | 0.51 | Completed |
98 | Supp and comm of 2.5TPD cap. Drum waste composting mach with OandM-3yr for treat of MSW at Regional Park | 0.85 | Completed |
99 | Supp, inst and comm of 20TDP cap Bio-metha Plant with OandM for treat of org MSW at Choitram Mandi- VGF | 7.20 | Completed |
100 | Supp, inst and comm 15TPD cap Bio-methanation plant with OandM for treat of Org MSW at Kabitkhedi on VGF | 7.54 | Completed |
101 | Construction of Garbage Transfer near Azad Nagar, Indore under Smart City Mission | 0.57 | Completed |
102 | Civil works for Construction and Demolition collection and transfer center at Kabitkhedi | 1.00 | Completed |
103 | Civil works for Construction and Demolition collection and transfer center at IT Park | 1.24 | Completed |
104 | Civil works for Construction and Demolition collection and transfer center at Gandhi Nagar | 1.08 | Completed |
105 | Construction of Shed for Garbage Drum compost Plant at Regional Park | 0.43 | Completed |
106 | Construction of Shed for Garbage Drum compost Plant at Nehru Park | 0.30 | Completed |
107 | Construction of Shed for Garbage Drum compost Plant at Zoo. | 0.27 | Completed |
108 | Construction of Additional shed at Garbage Transfer Station Located at Sanwer Road in sector F. | 1.44 | Completed |
109 | Construction of Shed at Garbage transfer Station located at Dhar Road in Zone- 16 | 1.06 | Completed |
110 | Supply of 2.0 TPD Bio Methanation near Star Square | 0.42 | Completed |
111 | Civil work for construction and demolition collection and transfer center at Ahirkhedi | 0.89 | Completed |
112 | Boundary Wall Construction Work for Biomethanation Plant at Choithram Sabji Mandi | 0.22 | Completed |
113 | Construction of Garbage Transfer Station near Rajshahi Hotel, Dhakkan Wala Kua. | 2.06 | Completed |
114 | Civil work and covering for constr and demolit waste treatment plant at trenching grn Nemawar road Devgu | 2.04 | Completed |
115 | Construction of Garbage Transfer Stations at Kabitkhedi, Sanwer Road and Sirpur | 4.92 | Completed |
116 | Construction work for Extension of Existing GTS and other Additional Work at Sangam Nagar. | 1.63 | Completed |
117 | Construction work for Extension of Existing GTS and other Additional Work at Star Square. | 1.20 | Completed |
118 | Construction work for Extension of Existing GTS and other Additional Work at Lalbagh. | 0.94 | Completed |
119 | Construction work for Extension of Existing GTS and other Additional Work at Azad Nagar | 0.99 | Completed |
120 | HT and LT Electrification including CCTV Work at New Palasia Garbage Transfer Station | 0.18 | Completed |
121 | Supp Erect and Comm of transfer Stn Equip 4n. Static Compc Sys with loadg mechn, 10 n detach con 6n Ho | 11.93 | Completed |
122 | Supply, Install, Integration and Maintenance of Integrated Man less Automation System IMAS for Door to Door Waste Transportation Vehicles at 9 Garbage Transfer Stations for ISCDL | 2.17 | Completed |
123 | Operation and Maintenance of transfer station with associated equipment and vehicles for Solid Waste Management | 4.46 | Completed |
124 | Supply,installation,testing and commisioning of a 2 TPD capacity organic waste converter machine alongwith operation and maintenance for processing of organic MSW at Jinsi Haat for 3 years | 0.49 | Completed |
125 | Engagement of transaction advisor for supervision ,monitoring ,development and management of municipal cororation indore swachh card management system | 0.85 | Completed |
126 | Supply of 10 Nos. waste bottle compaction with reverse vending machine | 0.14 | Completed |
127 | Balance Civil works at Garbage transfer station Sanwer road -F sector | 0.39 | Completed |
128 | Construction of additional work at GTS IT Park ,Indore | 0.42 | Completed |
129 | HT Line extension and installation, Testing and Commisioning of 100 KVA transformer, Garbage Transfer Station at Lal Baag Indore under SCM | 0.06 | Completed |
130 | Selection of system integrator for Designing ,Implementation and Maintenance of City Enterprise GIS platform for ISCDL Indore | 15.14 | Completed |
131 | Additional work at Kabitkhedi Garbage Transfer Station for Construction of Office ,Road side railings ,leachate tank and other subsidiary work | 0.46 | Completed |
132 | Construction of Garbage Transfer Station at New Palasia. | 0.46 | Completed |
133 | Tender for Operation and Maintenance of Transfer Station with associated Equipment and Vehicle for solid Waste Management | 4.45 | Completed |
134 | Supply, Installation, Commissioning and Operation of Connected Toilet Monitoring System, CTMS including software development and Maintenance of 5 Years. | 2.63 | Completed |
135 | Pilot project for automated weighment of waste transportation by Door to Door vehicles at star square, garbage transfer station for Indore municipal corporation. | 0.17 | Completed |
136 | Promoting Digital Payments | 0.17 | Completed |
137 | Supply, Installation, testing and Commissioning of GIS software for Indore Smart city | 1.23 | Completed |
138 | Upgradation of GIS software | 0.29 | Completed |
139 | Procurement of Work Flow Management System for IMC and AICTSL, Indore | 9.16 | Completed |
140 | selection of vendor for census of trees using GIS and GPS Technology and Preparation of software to operate and Manage census data | 1.04 | Completed |
141 | Selection of Agencies for Supply, Installation, Operations and Maintenance of 1000 LPH Capacity Water Purifier and Cooler at 100 Locations in Indore | 4.91 | Completed |
142 | Improvement of Water Supply Sewerage Systems in ABD Area of Indore Smart City and O M for 10 years | 76.12 | Agency terminated and Retendering Done |
143 | Work Order for Design ,Providing,Fixing,Testing & Commissioning of Pro-Audio System at 56 Dukan,Indore with 03 years comprehensive Maintenance | 0.41 | Completed |
144 | Design,Construcation, Interior and Furniture Supply for 2nd Floor Office (Phase II) at ISCDL,Nehru Park Office Building | 0.51 | Completed |
145 | Design,Engineering,Manufacture,Supply,Transport,Storage,Erection,Testing and Commissioning of 180 KWP Captive Rooftop Solar PV Power Plant with Associated Power System under Net Metering Policy including comprehensive O&M | 0.77 | Completed |